South Lamar Blvd Corridor Improvements
(Phase 2 - Barton Springs Road to US 290)

This is Phase 2 of the South Lamar Corridor Improvements construction. The applicant is proposing improvements to South Lamar Blvd between Barton Springs Road and U.S. 290 (Ben White Blvd/Loop 360) including sidewalk, shared use path, two-way bicycle track, payment mill & overlay medians, signal improvements, trees plantings, streetscape & placemaking, access management (driveways), and lane configuration changes.
Site Plan Application (2022-011692 SP; Reference File Name SP-2022-0034D)
- City of Austin Build+Connect Webpage (link)
- Interested Party Comments (<1 MB PDF)
- Application [2022-01-27] (2.2 MB PDF)
- Engineer's Summary Letter [2021-11] (<1 MB PDF)
- Environmental Resource Inventory [2019-05] (37.1 MB PDF)
Back to Development Projects list
Back to South Lamar Corridor Project page