1401-1407 Rabb Road

This page relates to the resubdivision in 2016 of Lot 1 (addressed as 1405 Rabb Rd) into three lots addressed as 1401, 1405, and 1407 Rabb Road and the subsequent construction on these lots. Lot 1 had previously been subdivided in 1953 into Lot 1 (1405 Rabb Rd) and Lot 1A (1409 Rabb Rd). The resubdivision and replatting of the lots triggered provisions of the Save our Springs (SOS) Oridance requirements which limits impervious cover:
Lot 1D - 1401 Rabb Rd (9,135 sf; maximum 25% impervious cover)
Lot 1C - 1405 Rabb Rd (6,127 sf; maximum 25% impervious cover)
Lot 1B - 1407 Rabb Rd (9,393 sf; maximum 25% impervious cover)
Listing of All Permits by Individual Addresses
- 1401 Rabb Rd (link to AB+C)
- 1405 Rabb Rd (link to AB+C)
- 1407 Rabb Rd (link to AB+C)
Plan Review Permit Applications
- Plan Review #2 (patio addition) for 1401 Rabb Rd (link to AB+C)
- Plan Review #1 (new house) for 1401 Rabb Rd on (link to AB+C)
- Plan Review #2 (swimming pool) for 1405 Rabb Rd (link to AB+C)
- Plan Review #1 (new house) for 1405 Rabb Rd (link to AB+C)
- Plan Review (new house) for 1407 Rabb Rd (link to AB+C)
Water Quality Site Plan (Case 2016-022923 SP; Reference File Name SP-2016-0111DS)
- City of Austin Build+Connect Webpage (link)
- Approved WQ Site Plan Permit [2016-04-11] (<1 MB PDF)
- Approved WQ Site Plan (2.5 MB PDF)
- Master Comment Report U1 [2016-04-05] (<1 MB PDF)
- Master Comment Report U0 [2016-03-11] (<1 MB PDF)
- Application Case Info U0 [2016-03-02] (<1 MB PDF)
Reubdivision Application (Case 2015-001904 C8; Reference File Name C8-2015-0001.0A)
This was the resubdivision of Lot 1 (located at 1405 Rabb Rd) of the Resubdivision of Lot 1-4 Inclusive of the Peschka Subdivision. Lot 1 was subdivided included three lots: 1B (1407 Rabb Rd), 1C (1405 Rabb Rd), and 1D (1401 Rabb Rd). It was approved on the consent agenda at the Planning Commision on January 12, 2016.
- City of Austin Build+Connect Webpage (link)
- Final Resubdivided Plat (PDF)
- Combined Case File-Part 1 (18.6 MB PDF)
- Combined Case File-Part 2 (9.6 MB PDF)
- PC Hearing Backup [2016-01-12] (1.1 MB PDF)
- PC Hearing Backup [2015-10-27] (<1 MB PDF)
- PC Hearing Backup [2015-10-14] (<1 MB PDF)
- Master Comment Report U3 [2015-08-19] (<1 MB PDF)
- Master Comment Report U2 [2015-06-25] (<1 MB PDF)
- Master Comment Report U1 [2015-04-15] (<1 MB PDF)
- Master Comment Report U0 [2015-03-23] (<1 MB PDF)
- Original Case Info U0 [2015-01-08] (1.7 MB PDF)
Back to Development Projects list Back to Site Plans and CUP list